5MW Land
Last Updated on:
2024-04-10
This benchmark focuses on the 5MW_Land_BD_DLL_WTurb simulation, witch is a land based NREL 5-MW turbine simulation using BeamDyn as the structural module. It simulates 20 seconds with a time step size of 0.001.
The original input files can be found here.
Software versions
The software versions used in this benchmark were the following:
Component | Version |
---|---|
OpenMP | 201511 |
OpenFAST | v3.5.2 |
gcc, g++, gfortran | 11.4.0 (Ubuntu 11.4.0-1ubuntu1~22.04) |
kernel | 6.6.12-linuxkit |
Execution times comparison
Faster execution times are better. Units in seconds.Loading...
Cost vs Time
The following plot shows how the execution times and costs vary with the number
of cores for each machine family.
For this specific simulation it is better to have a fast cpu instead of many cores,
with c3-standard-4
being the most cost-effective.
Loading...